TM 11-6625-3081-236-4. MAJOR TEST ADAPTER REPAIR (cont)6-4INSTALLATIONe. Install in reverse order ofremoval.END OF TASK5. SWITCH S1 OR S3 REPLACEMENTNOTEThis procedure is used to replaceswitch S1 or S3.REMOVALa. Rotate three turnlock fasteners(1) counterclockwise and open thecircuit card cover assembly (2).b.c.Remove two screws (3), lockwash-ers (4), and nuts (5).Tag and unsolder wires from twocontacts (6) and remove switch(7).INSTALLATIONd. Install in reverse order ofremoval.END OF TASK6-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business