EL9LQ-700-29
TM 11-6625-3081-23
6-10. OPTICAL-HOD AND IVD ALIGNMENT ASSEMBLY REPAIR (cont)
6-10
h.
Install leads on terminals of
PS1 and remove tags.
From
To
J2-19
PS1-E1
J2-24
PS1-E5
P6-6
PS1-E2
P6-27
PS1-E5
PS1-E2
PS1-E3
PS1-E2
E6 (GND LUG)
END OF TASK
2.
SWITCH S1 OR S2 REPLACEMENT
NOTE
This procedure is used to replace
either switch S1 (1) or S2 (2).
REMOVAL
a.
Tag and remove leads from
contacts of defective switch
(1) or (2).
6-24