TM 11-6625-3081-236-10. OPTICAL-HOD AND IVD ALIGNMENT ASSEMBLY REPAIR (cont)6-10c.Remove three screws (7) andwashers (8).d.Remove six screws (9), washers(10), and bracket and circuitcard assembly.INSTALLATIONe.Prepare six screws (9) forapplication of zinc chromateprimer (para 2-19).f.Apply a thin coat of zincchromate primer on three screwthreads.g.Install in reverse order ofremoval.END OF TASK5.YOKE LOAD COIL ASSEMBLY REPLACEMENTREMOVALa.Remove 12 screws (1), washers(2), and cover (3).b.Disconnect P7 (4) from A3J1 (5)on yoke load coil assembly (6).Change 66-27
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business