TM 11-6625-3081-23
5-7. BASE ASSEMBLY ADJUSTMENT
5-7
This task covers adjustment of pneumatic leveling and isolation system.
INITIAL SETUP
Equipment Conditions
Materials (appendix C)
Power removed (para 2-24.1)
Pneumatic supply in van turned off
Artists brush (Item 8)
and bled down
Sealing compound primer (Item 38)
(TM 11-6625-3085-12)
Sealing compound (Item 41)
Pneumatic system pressure bled down
(TM 11-6625-3085-12)
Personnel Required
Floor retaining bracket removed
(TM 11-6625-3085-12)
% 39B ATE Repairer
Reference
TM 11-6625-3085-12
1.
2.
Measure and record gap between pivot
plate (1) and pivot plate sockets (2)
at four corners of base assembly.
- -
Open door (3) on nightside bench.
Verify inlet port toggle valve (4)
is in open position (down).
5-42 Change 2