TM 11-6625-3081-23
Section VI.
GENERAL MAINTENANCE PROCEDURES
Subject
Surface Preparation. . . . . . . . . . . . . . . . . . . . . . .
Paint Touch-up and Marking Data . . . . . . . . . . . . . . . . .
Electrostatic Discharge Sensitive Circuit Card
Assembly Handling. . . . . . . . . . . . . . . . . . . . . . .
Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuse Requirements Summary . . . . . . . . . . . . . . . . . . . .
Switch Setting Requirements Summary . . . . . . . . . . . . . . .
Power Removal for Maintenance . . . . . . . . . . . . . . . . . .
Para
2-19
2-20
2-21
2-22
2-23
2-24
2-24.1
Page
2-152
2-157
2-159
2-162
2-165
2-172
2-180.1
2-19.
SURFACE PREPARATION
2-19
This task covers surface preparation of:
Para
Item
1.
Ground lead bonding
2.
Structure and hardware corrosion
control
INITIAL SETUP
Pipe cleaner (Item 37)
Zinc chromate primer (Item 39)
Tools
Trichlorotrifluoroethane (Item 48)
Distilled water (Item 49)
Goggles
Digital multimeter
Personnel Required
Rubber apron
Hard bristle brush
39B ATE Repairer
Materials (appendix C)
Reference
Artist brush (Item 8)
TM 11-6625-3085-12
Cheesecloth pad (Item 11)
Chemical film (Item 12)
Equipment Condition
Rubber gloves (Item 26)
Emery paper, 400 grit (Item 35)
Power removed (para 2-24.1)
2-152
Change 2
