TM 11-6625-3081-23
5-6. BASE ASSEMBLY REPAIR
5-6
This task covers replacement of:
Para
Item
Para
Item
1. Protective skirt
4.
2.
Tubing
Isolator assembly
5.
Fitting
3. Valve assembly
INITIAL SETUP
References
Tools and Special Tools
Torque wrench 0-100 ft-lb
Goggles
Jack (2)
Torque wrench 0-30 ft-lb
10 x 10 x 0.25 inch metal plate
Materials (appendix C)
Isopropyl alcohol (Item 4)
Artist brush (Item 8)
Acid brush (Item 9)
Cheesecloth pad (Item 11)
Hardwood block 4 x 4 x 8 inch (2)
(Item 34)
Pipe cleaners (Item 37)
Sealing compound primer (Item 38)
Sealing compound (Item 41)
Teflon tape (Item 46)
Personnel Required
% 39B ATE Repairer
One assistant
TM 11-6625-3085-12
TM 11-6625-3085-30
Equipment Conditions
E/O cable cover removed
(TM 11-6625-3085-30)
Power removed (para 2-24.1)
Pneumatic system bled down
(TM 11-6625-3085-12)
Interconnection cables disconnected
(para 5-5)
FOLLOWUP
Interconnection cables connected
(para 5-5)
E/O cable cover installed
(TM 11-6625-3085-30)
1. PROTECTIVE SKIRT REPLACEMENT
PNEUMATIC SYSTEM PRESSURE MUST BE
BLED DOWN BEFORE PERFORMING MAINTE-
NANCE ON BASE ASSEMBLY TO AVOID
INJURING PERSONNEL OR DAMAGING
EQUIPMENT.
5-8 Change 2