TM 11-6625-3081-23
2-73.
DISC/TAPE DRIVE STORAGE AND SHIPMENT PROCEDURES
2-73
This task covers:
Para
Item
1.
Preparation for operation
Para
Item
2.
Preparation for shipment or
storage
INITIAL SETUP
Equipment Condition
Personnel Required
Power removed (para 2-24.1)
396 ATE Repairer
Tools and Special Tools
T15 star driver
Torque wrench, in-lb
1.
PREPARATION FOR OPERATION
a.
b.
c.
d.
e.
f.
g.
h.
i.
END OF
Remove front panel (1) from disc/
tape drive assembly by grasping
sides and pulling cover off.
Remove four screws (2), lock-
washers (3), and washers (4).
Pull out disc drive assembly
until actuator lock and spindle
lock are accessible.
Unlock actuator by moving
actuator lock lever (5) to
OPERATE.
Loosen screw (6) and move spindle
lock lever (7) to OPERATE.
Tighten screw (6) to 20 in-lb.
Slide disc/tape drive assembly
into cabinet.
Install four washers (4), lock-
washers (3), and screws (2).
Install front panel (1).
TASK
Change 4
2-327