TM 11-6625-3081-23
5-27.
HARNESS ASSEMBLY REPAIR
5-27
This task covers replacement of:
Para
Item
Para
Item
1.
Connector J1, J3, or J4 contact
6.
Connector J5
2.
Connector A1P1 or A1P2
7.
Connector J6
3.
Connector XA1O or XA11
8.
Connector P8
4.
Connector XA13, XA14, or XA15
5.
Connector P3
INITIAL SETUP
FOLLOWUP
Materials (appendix C)
Indirect view display installation
(para 5-25)
Heat shrinkable insulation sleeving
(Item 28.2)
Heat shrinkable insulation sleeving
(Item 29.1)
Lacing and tying tape (Item 44)
Personnel Required
39B
ATE Repairer
CONNECTOR DATA TABLE
Change 9
5-119