TM 11-6625-3081-23
2-72. TRANSPORT RETAINER PROCEDURES
2-72
This task covers:
Para
Item
1. Preparation for operation
2.
Preparation for transport
INITIAL SETUP
Equipment Condition
Tools and Special Tools
Power removed (para 2-24.1)
Torque wrench
Personnel Required
39B ATE Repairer
1. PREPARATION FOR OPERATION
a.
On four retainer brackets (1)
remove 24 screws (2) and
washers (3).
b.
Remove eight screws (4), lock-
washers (5), washers (6), and
four protective cups (7).
c.
Remove stud (8).
d.
Loosen 12 screws (9) and position
flats on washers (10) toward
bench and slide retainer brackets
away from bench.
e. Torque 12 screws (9) to
50 ft-lb.
f.
Install stud (8).
g.
Install four protective cups
with eight screws (4), lock-
washers (5), and washers (6).
(7)
END OF TASK
Change 2
2-325