TM 11-6625-3081-23
2-63. BLOWER ASSEMBLY 2A2A15 REPLACEMENT
2-63
INITIAL SETUP
Equipment Condition
Personnel Required
Power removed (para 2-24.1)
39B ATE Repairer
One assistant
REMOVAL
1. Disconnect all cables from cable
entry panel A14.
2. On rear of test console test bench,
loosen two captive nuts (l), and
remove cover (2) and filter (3).
3.
Remove four screws (4), lockwashers
(5), and washers (6).
CAUTION
Be sure to disconnect ac cord from ac
plug mold to avoid damaging cord.
4.
Pull blower assembly (7) from cabinet
and disconnect ac power cord (8) from
plug mold (9).
5.
Pull blower assembly one-half way out
and disconnect ground lead (10).
INSTALLATION
6.
Inspect filter for defects and
cleaness (para 2-22).
7.
Set blower switch (11) to HI (up)
position before installing.
8.
Install blower assembly in reverse
order of removal.
9.
Connect all cables to cable entry
panel A14 (para 5-5).
END OF TASK
2-310
Change 2