TM 11-6625-3081-23
2-24.1 POWER REMOVAL FOR MAINTENANCE
2-24.1
INITIAL SETUP
FOLLOWUP
Personnel Required
Power on (TM 11-6625-3085-12)
Run E/O bench self-test (para 2-12)
396 ATE Repairer
References
TM 11-6625-3085-12
a.
This procedure is used to remove
electrical power from E/O bench and
electronic station before doing
maintenance.
(1)
(2)
(3)
On electronic station AC CONTROL
panel assembly 1A5 (1), set
CB3 (2) to OFF.
On AC CONTROL panel
set CB1 (3), CB2 (4),
and CB5 (6) to OFF.
assembly
CB4
On AN/USM-410 AC STATION,
1A5,
(5),
AC POWER CONTROL panel set E/O
SUBSYS circuit breaker (7) to
OFF.
(Refer to TM 11-6625-3085-12.)
END OF TASK
Change 7
2-180.1/(2-180.2 blank)